乐博体育平台app

ENGINEERING
Waste heat boiler of 180m2 sintering ring cooler in a factory
The plant uses the sintering machine and the cooling machine to generate electricity by waste heat. The production scale of the sintering machine is 311t/h. The annual production capacity of the sintering machine can reach 2 million 500 thousand tons per year and the steam output per ton is 38.4kg/t, based on the annual operation of 8000h.
XML 地图