乐博体育平台app

ENGINEERING
Waste heat utilization of 152 m2 sintering ring refrigerator in a iron and steel plant
The project uses the sintering machine and the cooling machine to generate electricity by waste heat. The production scale of the sintering machine is 270t/h. The annual production capacity of the sintering machine can reach 2 million 160 thousand tons per year based on the annual operation of 8000h. The steam output per ton is 75.9kg/t, and the power output per ton of ore is 12.7KW/t.
XML 地图